Booking stage inspections on a Melton South build
Where the windows sit in a City of Melton program.
In short: Trades follow closely. These are the moments before work disappears.
The program is fixed
An estate build runs to a schedule and the gap before the covering trade is short.
Slab pre-pour
Collars, barrier, mesh and cover. All permanent the moment concrete arrives.
Frame
Where the slab and timber meet: overhang, rebate condition and truss bracing.
Lock-up
Insulation and sarking, visible for days before plaster.
The membrane stage
After the membrane, before the tiler.
Pre-handover
A week before completion, so the list is with the builder before you sign.