Frame inspection in Melton South

The frame is the last look at structure, and the point where the slab and the timber finally meet.

  • Once frame and trusses are up and the roof is on, before sarking
  • 1 to 2 hours on site
  • Report within 24 hours
Price a Melton South inspectionA minute to fill in, and nothing is locked in.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before sarking
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Melton South frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Melton South builds

Melton South frames show up problems at that junction: bottom plates overhanging the slab, slabs protruding past the frame, damaged slab edge rebates and honeycombing along the edge.

What we find at this stage in Melton South

  • Fly bracing not installed to cut off trusses
  • Frame bottom plates overhanging the slab by over 10mm
  • Slab extending beyond the timber frame by over 20mm
  • Honeycombing along the slab edge
  • Slab edge rebate damaged
  • Waste pipes left uncapped
Waste pipes left uncapped at inspection, Melton South
Waste pipes left uncapped at inspection
Sample findings

Sample defects found during our frame inspections in Melton South

Annotated findings from Frame inspections on Melton South builds. Client addresses withheld.

Cut off trusses not braced back to the top plate, noted during a frame inspection in Melton South
Cut off trusses not braced back to the top plate
Bottom plates overhanging the slab by more than 10mm, noted during a frame inspection in Melton South
Bottom plates overhanging the slab by more than 10mm
Honeycombing noted along the slab edge, noted during a frame inspection in Melton South
Honeycombing noted along the slab edge
Slab edge rebate damaged in several areas, noted during a frame inspection in Melton South
Slab edge rebate damaged in several areas

The other stages of a Melton South build

  1. Bored piers inspection in Melton South1Bored piersAfter boring and cage placement, ahead of concrete
  2. Slab pre-pour inspection in Melton South2Slab pre-pourThe day before the pour, with steel, pods and formwork open
  3. Lock-up (pre-plaster) inspection in Melton South4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Melton South5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Melton South6WaterproofingOnce the membrane is on and cured, before tiling
  6. Pre-handover (PCI) inspection in Melton South7Pre-handover (PCI)Roughly a week ahead of practical completion

All construction stage inspections in Melton South →

Guides

Construction stage guides for Melton South

All guides →

Book a frame inspection in Melton South

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Melton South: common questions

What is fly bracing?

Bracing that ties a cut off truss back to the top plate so it cannot rotate. Without it the truss is not restrained the way the design assumes.

Is honeycombing serious?

It depends on extent and location. It indicates the concrete did not compact fully, so it is recorded and assessed rather than ignored.

Why does frame overhang matter?

The plate has to bear fully on the slab. Overhanging by more than 10mm reduces that bearing.

Do you check the trusses?

We check support, fixing and bracing. Whoever fabricated the trusses certifies their design.

Which standards?

AS 1684 for framing, with AS 4055 for wind classification.

Visible later?

Not without opening the wall.