Melton South Building
Inspections

Pre-Handover (PCI) Inspections in Melton South

The inspection before keys change hands, written down as a numbered list while the builder still carries the cost of fixing it.

  • Numbered list room by room
  • Written for the builder to work through
  • Each item against a clause or tolerance
  • Back with you inside a day
  • Timed to your handover date
  • Return visit before settlement
  • Measured, not estimated
  • Inspector contactable afterwards
Get a quoteLeave your details and an inspector will call.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Melton South pre-handover (PCI) inspection

A Melton South pre-handover inspection is assessed against your contract and selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.

Contract and selections

  • Colours against selections
  • Variations delivered
  • Occupancy permit status
  • Manuals and warranties left

Paint and plasterboard finish

  • Missed or thin coats
  • Nail pops and joint lines
  • Gapped cornice and skirting
  • Scuffs on ceilings

Doors and windows by hand

  • Doors swing and latch
  • Window sashes and locks
  • Flyscreens fitted
  • Door stops present

Bathrooms and ensuite

  • Fall to the floor waste
  • Silicone to tile junctions
  • Shower screen held firm
  • Grout gaps and lippage

Kitchen joinery

  • Benchtop chips and joins
  • Drawers run smoothly
  • Splashback cuts
  • Kickboards fitted

Taps and fixtures

  • Taps run without drips
  • Basins drain freely
  • Toilet seats fixed firm

Brick and render outside

  • Mortar smears on brickwork
  • Weeps clear of mortar
  • Articulation joints caulked
  • Render meeting window frames

Roof line and gutters

  • Ridge capping bedded
  • Gutter falls to outlets
  • Downpipes into the stormwater pit
  • Fascia paint finish

Garage and outside

  • Panel door runs by hand
  • Garage slab finish
  • Driveway and path joints
  • Fence and side gate

Lot drainage

  • Ground falls from the slab
  • Pits and grates clear
  • Soil kept below weep holes

38 checkpoints across 10 areas on a standard Melton South pre-handover (PCI) inspection. Anything locked, sealed or stacked over on the day is written up as not inspected. Work we could not reach is never recorded as satisfactory.

Sample findings

Sample defects noted during our pre-handover (PCI) inspections in Melton South

Taken from Melton South practical completion reports.

Slab cracking measured at 2mm to 4mm, past tolerance, noted during a pre-handover inspection in Melton South
Slab cracking measured at 2mm to 4mm, past tolerance
Walls bowed beyond the 5mm tolerance, noted during a pre-handover inspection in Melton South
Walls bowed beyond the 5mm tolerance
Cappings fixed from above rather than the required method, noted during a pre-handover inspection in Melton South
Cappings fixed from above rather than the required method
Mixer and pipework leaking at inspection, noted during a pre-handover inspection in Melton South
Mixer and pipework leaking at inspection
Water hammer heard when taps are turned on and off, noted during a pre-handover inspection in Melton South
Water hammer heard when taps are turned on and off
Wall, eave, door and window joints left uncaulked, noted during a pre-handover inspection in Melton South
Wall, eave, door and window joints left uncaulked
Sealant inadequate and needing repair, noted during a pre-handover inspection in Melton South
Sealant inadequate and needing repair
Paint and render to be cleaned off the service boxes, noted during a pre-handover inspection in Melton South
Paint and render to be cleaned off the service boxes
Bowed skirtings through the dwelling, noted during a fixing inspection in Melton South
Bowed skirtings through the dwelling
Plaster not flush at the garage wall, noted during a fixing inspection in Melton South
Plaster not flush at the garage wall
Our building inspection team
Why Melton South owners choose us

Independent. Licensed. Insured.

  • Whoever attends your Melton South site is the person who writes and signs the report.
  • Findings are referenced to AS 2870, AS 1684, AS 3740 or the Guide to Standards and Tolerances 2015.
  • We work from the engineering issued for your lot rather than a generic checklist.
  • The inspector's number stays on your report for the length of the build.
Guides

Pre-Handover (PCI) Inspections guides for Melton South

All guides →

Book pre-handover (pci) inspections in Melton South

Instant online pricing for Melton South, or contact the booking team.

FAQ

Pre-Handover (PCI) Inspections in Melton South: common questions

How far ahead of handover do I book?

About a week. That gives us time to attend and write it up, and gives you time to put the list in front of the builder before signing.

What is beyond a pre-handover inspection?

Circuits are not energised, plumbing is not pressure tested, heating and cooling are not commissioned, appliances and automatic garage door safety systems are not tested, and concealed framing or anything blocked is not inspected.

Is a 3mm slab crack acceptable?

No. The tolerances guide categorises cracking by width, and cracks measured between 2mm and 4mm sit outside the acceptable range. That is why we measure rather than describe.

Get a Free Quote